top of page
Search

11 Factors That Affect the Cost of Your Roof

Writer: Hinchman Brothers
Hinchman Brothers
5 hours ago
4 min read



Ask three roofers to price the same house and you can get three very different numbers. That's not always because someone is overcharging. A roof price is built from a handful of factors, and each roofer weighs them differently, or leaves some of them out.

Once you know what those factors are, a quote stops being a mystery number. You can see what you're paying for, and you can tell when a low price is low because something's missing.

Here are the 11 things that drive the cost of a new roof.

The roof itself

1. Size

Roofers price by the "square," which is 100 square feet of roof. More squares means more shingles, more underlayment, more nails, and more hours. Your roof is bigger than your floor plan, because of the overhangs and the slope, so don't estimate it from your home's square footage.

2. Pitch

Pitch is how steep the roof is. A low roof a crew can walk on goes fast. A steep one means harnesses, roof jacks, slower work, and more care with every bundle carried up. Steeper roofs also have more surface area for the same footprint, so they take more material too.

3. Complexity

A simple ranch roof with two sides is the cheapest shape to roof. Every extra hip, valley, dormer, and change in angle adds cuts, flashing, and time. A two-story house adds to it as well, because everything takes longer when the edge is farther from the ground.

4. Penetrations

Anything that pokes through the roof has to be flashed and sealed: plumbing vents, exhaust vents, skylights, and chimneys. Small pipes don't add much. Chimneys and skylights take real time to flash correctly, and they're among the most common leak points if they're rushed.

What comes off, and what's underneath

5. Layers to tear off

Every layer of old roofing has to be stripped, loaded, hauled, and paid for at the dump. Two layers take more labor and more disposal than one. Building codes based on the International Residential Code don't allow a new layer over two or more existing ones, so if your roof already has two, everything comes off down to the wood.

6. The decking

The decking is the wood the shingles are nailed to. Any of it that's rotten, soft, or broken has to be replaced before the new roof goes on, and nobody knows exactly how much until the old roof is off. Older houses, like many around Chattanooga and Red Bank, may have board decking instead of plywood, which can need extra work. This is the one part of the price that can change after you sign, which is why your quote should list a price per sheet.

What goes on

7. The roofing material

The material you pick is one of the biggest swings in price. Architectural asphalt shingles are the usual middle ground: more durable than 3-tab, far cheaper than metal or slate. Premium shingle lines cost more, and metal, slate, and tile cost much more, though they last longer.

8. Everything besides the shingles

A roof is a system, and the shingles are only the part you see. A complete replacement also includes drip edge, underlayment, ice and water barrier in the valleys and other leak-prone spots, starter strips, flashing at walls and chimneys, pipe boots, and ridge caps. Each one costs money, and each one is something a cheap quote might quietly leave out.

The job and the company

9. Ventilation

An attic that can't breathe traps heat and moisture and wears shingles out from underneath. If your roof doesn't have enough intake at the eaves or exhaust at the ridge, fixing it during the replacement adds some cost, and saves you from wearing out the new roof early.

10. Access and protecting your property

A crew needs to get materials up and old roofing down without wrecking the yard. A steep driveway, a hillside lot, a fenced backyard, tight neighbors, or landscaping right against the house all slow the job down. Lots of homes around Chattanooga sit on hills, and that matters more here than in flat towns. Protecting your shrubs, windows, AC unit, and driveway takes materials and labor too, and it's one more thing a low bid might skip.

11. Who you hire

Two companies can quote the identical roof and still be thousands apart, because the company itself is part of the price. A licensed roofer carrying liability and workers' comp insurance, paying an experienced crew, pulling the permit, and backing the work with a written warranty has costs a fly-by-night crew doesn't. That gap shows up in the quote. It also shows up later, when something goes wrong and you need someone to call.

How to use this when you compare quotes

You can't change your roof's size, pitch, or shape. Those first few factors are the same no matter who you hire. The rest are where quotes really differ, so that's where to look.

Put your quotes side by side and check each one for:

  • Tear-off of every existing layer, plus disposal

  • A price per sheet for replacement decking

  • The shingle brand and product line, by name

  • Drip edge, underlayment, ice and water barrier, starter strips, and ridge caps

  • New flashing and pipe boots, not resealed old ones

  • Any ventilation work

  • Property protection and cleanup

  • License, insurance, permit, and a written workmanship warranty

If one quote is much lower, find the line it's missing. Most of the time, once every roofer is quoting the same job, the gap shrinks a lot. For real dollar figures, see our article on what a new roof costs in Chattanooga.

Get a quote that shows its work

We're Josiah and Sam, two brothers who run Riverbend Roofing out of East Brainerd. When we quote a roof, every one of these factors is spelled out, including the per-sheet price for any bad decking, so you know what you're paying for before we start. We'll get up on your roof, send you photos and video of what we find, and if it's a repair, we'll tell you that. On most jobs, you don't pay us anything until the work is finished and you've looked at it.

Call 423-718-0594 or request a free inspection. We work across Chattanooga, Hixson, Red Bank, Ooltewah, Soddy-Daisy, and Cleveland.


Sources

Ā 
Ā 
Ā 

Comments


bottom of page